Must Know: Quote Details


For the fastest quotation, please send us as much of the required information for your RFQ project as you can. You can refer to Part Specifications for Quote for more details.

Basically, the quote usually includes the following information:

Part No. As per customer's drawing.
Mold Charge Usually quote in USD.
Part Price Usually quote in USD/pc. for various batch quantity.
Material Aluminum, Alloy Steel, Brass, Copper, Carbon Steel, Plastic, Stainless Steel, Titanium
Surface Finish Sandblasting, Coating, Plating, Anodizing, Plain. See Post Processing.
Lead Time Depends on each item.
Terms of Price Usually Ex Works Taiwan. Ask us if other Terms of Price are required.
Remarks Other important information not shown above.

Different Types of Quote


  1. ) Quote for CNC Machining Part
  2. CNC Machining Service 501205 Rev. C
  3. @US$7.15/pc., qty 50 pcs.
  4. 00/pc., qty 100 pcs.
  5. 30/pc., qty 200 pcs.

Material: Stainless Steel 303

Finish: Plain

  1. ) Quote for Plastic Injection Project
  2. Plastic Injection Project 00165
  3. Plastic Injection Mold Charge: US$28,200.00; 2-cavities
  4. Part Unit Price: @US$8.48/pc., qty 1,000 pcs
  5. Material: Nan-Ya 6210GC(PA66+30%GF)
  6. Lead Time for Building Mold and T1 Sample: 7-8 weeks.
  7. Mass Production: 2-3 weeks.
  8. Remarks: Mold size 200x200x240mm
  9. Mold insert in P20
  10. ) Quote for Stamping Project

Stamping Project

Stamping Mold Charge: US$24,500.00; Progressive Mold

Part Unit Price: @US$5.17/pc., qty 50,000 pcs

  1. 80/pc., qty 100,000 pcs
  2. Material: Brass C2680
  3. Finish: Nickel Plating
  4. Lead Time for Building Mold and T1 Sample: 6-7 weeks.
  5. Mass Production: 4 weeks.
  6. ) Quote for Die Casting Project

Aluminum Die Casting End Cap

Die Casting Injection Mold Charge: US$4,480.00; 1-cavity

Part Unit Price: @US$1.95/pc., qty 2,000 pcs

1.60/pc., qty 5,000 pcs

Material: Aluminum Die Casting ADC12

Surface Finish: Wet Coating, color RAL9006

Lead Time for Building Mold and T1 Sample: 6-7 weeks.

Mass Production: 3-4 weeks.